AUTHORITY BEFORE ACTIONSOVEREIGN MISSION INTELLIGENCE AND AUTHORIZED ACTIONDENY by defaultEVIDENCE before effect
Public assurance
Public technical documents
The architecture, its threat model, and a synthetic walkthrough of a decision that is refused. Written for evaluators who need the reasoning, the boundaries and the limits.
Each document is a public edition with a document identifier, a version, a publication date and a revision history, published as an accessible HTML page and as a PDF with a SHA-256 checksum. The documents describe the architecture of Verity Command; they do not claim certification, accreditation, compliance status or independent assessment.
Who may act, on what basis and within which boundary — and what happens when that basis cannot be established. The twelve modules, thirteen trust boundaries, the authority decision path, evidence before effect, time, leases, revocation and provenance.
What the architecture protects, detects and cannot guarantee. Fifteen residual risks stated up front — from sensor spoofing and insiders with valid keys to traffic analysis, stale revocation and physical action outside the enforcement boundary.
When the correct decision is refusal. An urgent, reasonable proposal is refused for five itemized reasons; no instruction is issued and no effect occurs. Independent evidence and a human quorum then produce a narrower authorization, distributed and enforced at the edge.
Compare the SHA-256 checksum of a downloaded PDF with the value shown here, for example with shasum -a 256 on macOS or Linux, or certutil -hashfile <file> SHA256 on Windows. The checksum is also published as a .sha256 file next to each PDF.